Review Plans and Documents for Current Projects
53 Sturbridge Road - Amazon
- 2021-06-17 53 Sturbridge Road Site Plan Review Special Permit Set_rev
- 2021-06-17-53 Sturbridge-Site Plan Review-Narrative-Letter
- 2021-06-17-53 Sturbridge Rd Warehouse TIA 06_21
- 2021-06-17 53 Sturbridge Road Stormwater Management Report
- 2021-06-17 17.01.55-Application forms
Charlton Developer 241 Sturbridge Road
- Charlton Warehouse TIA 03_21
- Town TIS_Appendix
- 210330 Charlton- 241Stur Architecturals
- 2021-03-31 241 Sturbridge PB Permit Set- Langan
- 2021-03-31 241STUR Charlton Stormwater Management Report (COMPILED)
- 241 Sturbridge Road Offsite Utility 3-31-2021
Charlton Public Safety Facility
- Charlton Public Safety- NOI Cover Letter (PDF)
- Charlton Public Safety - NOI and Stormwater Report (PDF)
- Charlton Public Safety Permitting Site Plans (PDF)
Healthwise / Green Gold (46 Worcester Rd) Documents
- MassDOT Curbcut Plan (rev 5/13/19)
- McClure Response to Graves Engineering Peer Review (5/13/19)
- Graves Engineering Peer Review (5/10/19)
- MassDOT Curbcut Plan (4/18/19)
Wildwood Mushroom Documents:
- Approval Not Required (ANR) Plan (4/27/19)
Charlton Optical Submittal Documents:
- Site Plan (rev 4/11/19)
- Graves Engineering Peer Review (4/2/19)
- Zoning Enforcement Officer Review
- Site Plan (3/7/19)
- Site Plan Review Application
Four Score Submittal Documents:
- Special Permit Application (5/1/19) - Request for Modification for retail sale of medical and adult use marijuana
- Traffic Study (7/17/18)
- Site Plan (2019)
- Drainage Report (2019)
- Existing Conditions Plan (2019)
- Existing Elevations (2019)
- Revised Plans (12/19/18)
- O&M Stormwater System Narrative (12/19/18)
- Engineering Response to Graves Peer Review (12/19/18)
- Special Permit Application (7-31-18)
Valley Green Grow Site Plan Submittal Documents:
Additional Submittals - Definitive Plan - March 2019:
- Graves Peer Review Letter (3/6/19)
- Details Plan (3/4/19)
- Meridian Associates Stormwater Pollution Prevention Plan (Draft 3/4/19)
- Meridian Associates Long Term Pollution Prevention Plan (Draft 3/4/19)
- Graves Peer Review Letter (3/1/19)
Additional Submittals - Definitive Plan - February 2019: - Definitive Subdivision Set (2/26/19)
- Meridian Associates Response to Graves Peer Review (2/26/19)
- Stormwater Checklist
- Graves Peer Review Letter (2/25/19)
- Meridian Associates Response to Graves Peer Review (2/21/19)
- Stormwater Management Report (2/21/19)
- Definitive Subdivision Set (2/21/19)
- Graves Peer Review Letter (2/1/19)
Additional Submittals - Site Plan - December 2018: - Fire Dept Comments (12/28/18)
- Soil Management Plan (1/2/19)
- Acentech Sound Study (1/2/19)
- Graves Peer Review Letter (1/2/19)
- Meridian Associates Response to Graves (12/28/18)
- HMMH Review - Sound Study (12/26/18)M
- Acentech Sound Study (Draft 12/21/18)
- Ostojic Memo on Odor Plan (12/28/18)
- Odor Mitigation Plan (12/28/18)
- BOH Ltr on Odor Plan (12/20/18)
- HVAC Odor Control Design Criteria (Draft 12/10/18)
- Site Plan Set (12/12/18)
- Fire Memo (10/19/18)
- Meridian Associates Response to Graves Peer Review (12/12/18)
- Stormwater Management Report (/12/12/18)
- Odor Mitigation
- Power Utilization and Cogen Sizing Summary
- Board of Health Letter on Odor
- MassDOT Letter re: Access
Additional Submittals - Definitive Plan - January 2019: - Definitive Subdivision Set (1/17/19
- Meridian Associates - Stormwater Letter Calcs (1/17/19)
- Graves Peer Review Letter (1/14/19)
- Definitive Subdivision Set (1/9/19)
- Meridian Associates - Stormwater Letter Calcs (1/9/19)
Additional Submittals - Definitive Plan - December 2018: - Graves Peer Review Letter (1/2/19)
- Graves Peer Review Letter (12/31/18)
- Graves Peer Review Letter (12/24/18)
- Meridian Associates - Stormwater Letter (12/20/18)
- Definitive Subdivision Plan Set (rev 12/20/18)
- Meridian Associates Response to Graves Peer Review (12/20/18)
- Meridian Associates Transmittal Ltr to PB (12/24/18)
- Definitive Subdivision Plan Set (rev 12/11/18)
- Meridian Associates - Stormwater Letter (12/11/18)
- Meridian Associates Response to Graves Peer Review (12/11/18)
- Graves Peer Review Letter (12/17/18)
Additional Submittals - December 2018: - Subdivision Plan Set revise date 12/11/18
- Meridian Associates - Stormwater Letter (12/11/18)
- Meridian Associates Response to Graves Peer Review (12/11/18)
- WDA Wetlands Crossing Memo (12/3/18)
- WSP Traffic Peer Review (12/6/18)
- WSP Traffic Peer Review (12/10/18)
Additional Submittals - November 2018: - Site Plan Revise date 11/19/18
- EcoTec Wetlands Opinion (11/28/18)
- Tighe and Bond Peer Review (11/12/18)
- Vanderweil Engineers - Noise Mitigation Plan (11/26/18)
- Vanderweil Engineers - Odor Mitigation Plan (11/26/18)
- Graves Eng. - Charlton Orchards definitive plan letter (11/12/18)
- Graves Eng. - Second site plan peer review letter for VGG (11/9/18)
- HMMH Prelim Noise Review
- R Marijuana Charlton
- Responses to Questions
- Summary Water Plan
- Rendering from Abutting Properties
- Video - Aerial View of the VGG Site
- Video - View of VGG Site While Driving Down Old Worcester Road
- Video - Demonstration of the Blackout Curtain
Final Submittal - October 2018: - Traffic Study (revised)
- Transmittal Letter
- Application for Approval
- Stormwater Letter
- Definitive Site Plan Set
Site Plan Revisions - October 2018: - Site Plan Review Narrative (clean)
- Site Plan Review Narrative (redlined)
- Revised Permit Plan Set
- Responses to Peer Review Comments from Graves Eng.
- Responses to Questions and Comments
- Site and Abutter Overlay Map
- Lighting, Blackout Curtains, Rockwool, and any additional specificiation sheets are available for review at the Planning Board office.
Site Plan Submittal - August 2018 - Graves Eng. Peer Review
- WSP Peer Review (Traffic)
- Site Plan Review
- Site Plan Review Narrative
- Site Plan 8/13/18
- Exterior Elevations
- Phase I Site Assessment
- Geotechnical Report 7/11/18
- Traffic Study
- Security Plan
- Odor Mitigation Plan
- OSQ Area Luminaire
- Stormwater Mgmt Plan 8/14/18Photometric Plan
- Lighting Spec Sheets are available for review at the Planning Board office.